Bahasa Indonesia   
Inggris
1. How to Put Tile (Zig Zag) 
Tile Installation must be done in Zig-Zag to reduce 
number of stacks overlap in one place, with the goal of getting 
piles overlap very precise so as to prevent water from entering 
on tile connection (Overlap). 
Tile should be installed tightly and blend with battens. 
2. Screw Fitting Method 
At the time of installation of tile, tile joint position / overlap 
upper (blue line) should be placed just above the roof line / 
overlap the bottom (red line) in the previous tile and make sure 
below the overlap position (red line) should always be under a pile of overlap 
upper (blue line) on each subsequent tile preparation. 
Screw connection should not be installed close to the tile (overlap) 
or water line to prevent water entering through the screw hole. 
At the time of installation of the tile screw, screw position should be parallel 
the slope of the roof and are not allowed to drill from the top.
													Cara pemasangan genteng metal Minimalis Allure yang baik dan benar