HOW TO TILE INSTALLATION MINIMALIS ALLURE RT 1

minimalis allure installation1. How to Put Tile (Zig Zag)
Tile Installation must be done in Zig-Zag to reduce
number of stacks overlap in one place, with the goal of getting
piles overlap very precise so as to prevent water from entering
on tile connection (Overlap).
Tile should be installed tightly and blend with battens.

2. Screw Fitting Method
At the time of installation of tile, tile joint position / overlap
upper (blue line) should be placed just above the roof line /
overlap the bottom (red line) in the previous tile and make sure
below the overlap position (red line) should always be under a pile of overlap
upper (blue line) on each subsequent tile preparation.
Screw connection should not be installed close to the tile (overlap)
or water line to prevent water entering through the screw hole.
At the time of installation of the tile screw, screw position should be parallel
the slope of the roof and are not allowed to drill from the top.


Artikel
 
 

Atrikel Terkait
CARA PEMASANGAN GENTENG MINIMALIS ALLURE BAGIAN 2

Cara pemasangan genteng metal Minimalis Allure yang baik dan benar


 
 
 
TERHUBUNG DENGAN KAMI
 
facebook   twitter   instagram   youtube
 
 
Pertanyaan
 
 
TELEPON CS KAMI
(021) 5565-8080
 
 
 
 
 
ISO award
Home

Idea award
 
 
Hubungi Kami
PT. Timur Mas Abadi
Jl. Pajajaran no.55, Jatiuwung
Tangerang - Indonesia 15137
Telp. 021-5565 8080 Fax. 021-5565 8181
 
 
BCA
754 033 3887
a.n PT. Timur Mas Abadi
 
MANDIRI
155 006 7878 788
a.n PT. Timur Mas Abadi